Asbestos Test
A sample sent to an accredited lab before any scraping on older ceilings. Positive results go to a licensed abatement contractor.
Popcorn and acoustic ceilings tested for asbestos, then scraped with the room sealed in plastic, skim-coated smooth or given a new texture, primed and painted.
Popcorn texture was common on ceilings into the 1980s and 1990s. Here is why people take it down, and what to check first.
Scraping is the messy part. The work that makes the ceiling look right comes after it.
A sample sent to an accredited lab before any scraping on older ceilings. Positive results go to a licensed abatement contractor.
Floors and walls covered in plastic, vents sealed, furniture removed or wrapped, so the dust stays in the room.
Texture misted and scraped off in sections, which keeps dust down and protects the paper face of the drywall.
A smooth Level 4 or 5 skim coat, or a light knockdown or orange peel if the ceiling has flaws you would rather hide.
A primer made for new joint compound, then a flat ceiling paint that hides minor waves.
Plastic rolled up with the debris inside, the room vacuumed with a HEPA vacuum, and waste removed.
Thinking of a whole-floor removal? It goes faster before furniture moves in; call early.
๐ Call (980) 243-8188Matthews has a large stock of homes built in the 1980s and 1990s, and spray-on popcorn and acoustic textures were common on ceilings of that era, especially in bedrooms and hallways. Most of those ceilings are now dusty, stained and heavy with repaint.
Before anyone scrapes, the texture should be tested. The EPA notes that some textured ceilings contain asbestos, and HomeGuide recommends testing ceilings installed before 1986. If a test comes back positive, the ceiling goes to a licensed abatement contractor, not a painter.
Once texture is off, what is under it is rarely perfect: builders sprayed popcorn partly to hide rough seams. We plan for a skim coat or a light texture rather than assuming a smooth ceiling, and in pre-1978 homes, painted ceilings also follow lead-safe practices.
Test, contain, scrape, smooth, paint. A room is usually out of use for two to three days.
A sample goes to an accredited lab. If it contains asbestos, we stop and refer you to licensed abatement.
Furniture out, floors and walls in plastic, vents and fixtures covered, and power to ceiling fixtures off.
Texture wet-scraped, seams repaired, and a skim coat or new texture applied and sanded.
Primer and flat ceiling paint, plastic and debris removed, and the room vacuumed.
Ready for step one?
Call (980) 243-8188Ask whether the price includes the asbestos test, the skim coat or texture, primer and paint, and how the room will be sealed.
Why older textured ceilings should be tested before anyone scrapes them.
Explains the lead-safe rules that apply when painting work disturbs paint in homes built before 1978.
Which ceilings to test and how.
Skim coat levels and when texture is smarter.
Walls are usually painted after a ceiling job.
National benchmarks per square foot.
The test comes first and the dust stays in the room. Our team quotes the finish, not just the scraping.
Straight answers on cost, asbestos, mess and what the ceiling looks like after.
Removal is priced by square foot, plus testing and the finish you choose. HomeGuide's national benchmark is $2 to $6 per square foot including refinishing, or $2,000 to $9,000 for a typical home, with asbestos testing at $250 to $850 (October 2023).
Read the cost sources and assumptions.
Question about your property? Call (980) 243-8188You cannot tell by looking. Asbestos was used in some textured ceiling products; testing is recommended for ceilings installed before 1986. A lab test of a small sample gives the answer.
Question about your property? Call (980) 243-8188We do not scrape it. Asbestos ceilings are removed by a licensed abatement contractor, or left in place and encapsulated. We can paint or refinish after abatement.
Question about your property? Call (980) 243-8188Very, which is why the room is sealed in plastic and the texture is wet-scraped. The plastic rolls up with the debris, and the room is vacuumed afterward.
Question about your property? Call (980) 243-8188Not without a skim coat. Ceilings under popcorn usually have rough seams. We either skim coat for a smooth finish or apply a light texture.
Question about your property? Call (980) 243-8188Yes, with a thick-nap roller or sprayer, but it adds weight and makes later removal harder. If the texture is loose, paint can pull it down.
Question about your property? Call (980) 243-8188About two to three days per room or open area: scraping, skim coat drying time, sanding, primer and paint.
Question about your property? Call (980) 243-8188Yes. The room being worked on is sealed off; the rest of the house stays usable.
Question about your property? Call (980) 243-8188Tell us the rooms, the ceiling height, and roughly when the house was built. We will start with a test and a written scope.